Primary tabs

License

License not specified

Other Access

The information on this page (the dataset metadata) is also available in these formats.

JSON RDF

via the DKAN API

Climate Change Projections for Water Storage Investment Program (WSIP)

To aid applicants with quantification and monetization of benefits of proposed water storage projects per Chapter 8 of Proposition 1 (Water Code section 79750 et. seq.), the California Water Commission (Commission) developed a Technical Reference which was released in August 2016.

These data and model products are companion information to the Technical Reference and were developed to assist applicants for funding under the Water Storage Investment Program (WSIP). The WSIP required applicants for public funding to analyze their proposed projects using climate and sea level conditions for California projected at years 2030 and 2070.

The data and model products were developed for the following climate and sea level conditions:

  • Without-Project 2030 Future Conditions – Year 2030 future condition with projected climate and sea level conditions for a thirty-year period centered at 2030 (climate period 2016-2045)

  • Without-Project 2070 Future Conditions – Year 2070 future condition with projected climate and sea level conditions for a thirty-year period centered at 2070 (climate period 2056-2085)

  • 1995 Historical Temperature-detrended Conditions (reference) – Year 1995 historical condition with climate and sea level conditions for a thirty-year period centered at 1995 (reference climate period 1981-2010)

California Water Commission

The California Water Commission consists of nine members appointed by the Governor and confirmed by the State Senate. Seven members are chosen for their expertise related to the control, storage, and beneficial use of water and two are chosen for their knowledge of the environment. The Commission provides a public forum for discussing water issues, advises the Director of the Department of Water Resources on matters within the Department’s jurisdiction, approves rules and regulations, and monitors and reports on the construction and operation of the State Water Project. Proposition 1: The Water Quality, Supply, and Infrastructure Improvement Act approved by voters in 2014, gave the Commission new responsibilities regarding the distribution of public funds set aside for the public benefits of water storage projects, and developing regulations for the quantification and management of those benefits. In 2018, the Commission approved maximum conditional funding amounts for eight projects in the Water Storage Investment Program.

Source: CNRA Portal
FieldValue
Publisher
Modified Date
2019-01-17
Release Date
2019-01-17
Identifier
23c1e1d4-d941-4c3b-a2a5-beae44e4515e
Contact Name
California Water Commission
Contact Email
Public Access Level
Public
POD Theme
Water
Harvested from CNRA Portal
Harvest Source TitleCNRA Portal
Harvest Source URIhttps://data.cnra.ca.gov/data.json
Last Harvest PerformedFri, 01/18/2019 - 07:29